tel: 11 5546.0733 São Paulo SP Brasil
HOME PORTUGUÊS ENGLISH ESPAÑOL SEARCH
 
> Social Action Plan for the Onca Puma Mining Project

The Onça Puma project is one of the largest nickel mines in the world. Total direct and indirect employment during operation will be over 3,000 jobs. The host communities (Ourilândia and Tucumã in the southern region of the State of Pará) each have a current population of approximately 15.000.

JGP was engaged by the project’s initial developer to produce a comprehensive set of social and community development programs compatible with Equator Principles. The client’s concern was not only with meeting requirements of the financial institution responsible for structuring the project’s funding, but also with ensuring benefits to the host communities will be maximized and undesirable indirect social impacts are kept to a minimum.


JGP structured a Social Action Plan to assist the communities of Ourilândia and Tucumã in coping with additional demand for housing, urban utilities, health and education and other associated social impacts. Training of the local workforce and local suppler development programs were proposed. A series of strategies aimed at population influx management and control were proposed and were the object of extensive local consultation.

JGP is advising the Onça Puma project´s current owner with implementation of the Social Action Plan.

> OTHER LANDMARK PROJECTS

Imigrantes Highway Duplication

Sao Paulo Metropolitan Beltway

Social Action Plan for the Onca Puma Mining Project

Socio-environmental assessments of non-wood forest product extraction in the Amazon Region

Quinta da Baronesa residential development

Comprehensive resettlement plan for irregular buildings in transmission line easements in central and southern Peru

Environmental management system and supply chain environmental stewardship procedure, for a soybean and vegetable oil complex in the states of Mato Grosso and Amazonas

Risk analysis and preliminary planning of emergency works in 23 irregular settlements in the Metropolitan Region of São Paulo

Implementation of environmental management and monitoring programs during construction of the Ourinhos hydroelectric plant

JGP Consultoria e Participações Ltda. TEL: 11 5546.0733 Design: M.Peri Design      Sistema: Construnet